Sarpi RK1

April 2023 - today

4/2023 – today

Description: project management (on-site) of a E-I&C - "waste to energy" - project

Client: Griesemann Gruppe / Sarpi Deutschland GmbH

Location: Marl / Germany

 

 

 

PM2 - Obbola

September 2021 – February 2023

9/2021 – 2/2023

Description: site management at the new PM2 (paper machine, Kraftliner; I&C - installation)

Client: Christof Industries Austria / Voith Paper Germany / SCA Obbola

Location: Obbola / Sweden

 

 

CSL - Behring

August 2020 – August 2021

8/2020 – 08/2021

Description: erecting of a new pharmaceutical plant

Client: Jacobs Engineering / CSL Behring

Location: Lengnau / Switzerland

 

COVID19 lockdown

April 2020 - July 2020

4/2020 – 7/2020

Description: economic stall due to the virus - pandemic

Client: ---

Location: ---

 

CalPlant1

June 2019 – March 2020

6/2019 – 3/2020

Description: electrical installation, of the world's 1st rice strow-based MDF plant

Client: KS Industrial Corp. / CalPlant1 LCC

Location: Willows, California, USA

 

BillerudKorsnäs AB

March 2018 – May 2019

3/2018 – 05/2019

Description: electrical installation, next generation - KM7

Client: BillerudKorsnäs

Location: Grums / Sweden

 

Pina S.A. (Losán Grupo)

November 2017 – February 2018

11/2017 - 2/2018

Description: electrical erection of a pressboard line with all auxilliaries

Client: Kurt Schuhmacher / Pina S.A. (Losán Grupo)

Location: Fuentens (Cuenca) / Spain

 

Porsche

July 2017 – August 2017

7/2016 – 8/2017

Description: change of electric monorail system (EMS) and modifying of skillet conveyors

Client: DÜRR /Germany; Porsche / Germany

Location: Zuffenhausen / Germany

 

Metsä Fibre Oy - pulp drying line

August 2016 – June 2017

8/2016 - 6/2017

Description: electrical installation of a pulp drying line and baling line

Client: Metsä Fibre Oy / Finland (in partnership with Valmet / Finland)

Location: Äänekoski / Finland

 

 

 

 

 

 

 

 

 

 

 

Tata Steel Ijumiden BV - hot strip mill 2

 

 

 

 

 

July 2016

 

 

 

 

 

7/2016

 

 

 

 

 

Description: modification of hot strip mill 2 (coiler 1&2) colission-list

 

 

 

 

 

Client: Primetals Technologies / Austria; SMS group GmbH / Germany; Tata Steel Ijumiden BV / Netherlands

 

 

 

 

 

Location: Velsen-Noord / Netherlands

 

 

 

 

 

 

 

 

 

 

 

Tata Steel Ijumiden BV - hot strip mill 2

 

 

 

 

 

July 2016

 

 

 

 

 

7/2016

 

 

 

 

 

Description: modification of hot strip mill 2 (coiler 1&2) colission-list

 

 

 

 

 

Client: Primetals Technologies / Austria; SMS group GmbH / Germany; Tata Steel Ijumiden BV / Netherlands

 

 

 

 

 

Location: Velsen-Noord / Netherlands

 

 

 

 

 

 

 

 

 

 

 

GE-General Electrics - Birr 4 (former ALSTOM)

 

 

 

 

 

July 2015 – June 2016

 

 

 

 

 

7/2015 - 6/2016

 

 

 

 

 

Description: Erection of the Gas turbine GT36 prototype – Test Centre

 

 

 

 

 

Client: GE - Switzerland  and Ansaldo Energia  former Alstom Switzerland AG

 

 

 

 

 

Location: Birr / Switzerland

 

 

 

 

 

 

 

 

 

 

 

Kronospan Burgos (Line 6)

 

 

 

 

 

February 2015 – June 2015

 

 

 

 

 

2/2015 – 6/2015

 

 

 

 

 

Description: dismantling (relocation) of a Küsters wood board press incl. forming and finishing line.

 

 

 

 

 

Client: Kronospan / Spain; Kronospan / Serbia

 

 

 

 

 

Location: Burgos / Spain

 

 

 

 

 

 

 

 

 

 

 

MDF - Hallein

 

 

 

 

 

September 2014 – January 2015

 

 

 

 

 

9/2014 – 1/2015

 

 

 

 

 

Description: dismantling for relocation of a complete MDF- factory.

 

 

 

 

 

Client: Kronoplus Technical AG, Switzerland

 

 

 

 

 

Location: Hallein / Austria

 

 

 

 

 

 

 

 

 

 

 

Rittal Haiger

 

 

 

 

 

August 2014

 

 

 

 

 

8/2014

 

 

 

 

 

Description: Erection of an automatic high bay-warehouse (8 aisles), automated small parts storage (6 aisles) and complete boxes and pallets - conveying system.

 

 

 

 

 

Client: BSS – Bohneberg / Germany; Rittal / Germany

 

 

 

 

 

Location: Haiger / Germany

 

 

 

 

 

 

 

 

 

 

 

PLEX 2

 

 

 

 

 

September 2013 – July 2014

 

 

 

 

 

9/2013 – 7/2014

 

 

 

 

 

Description: Modification and Plant Lifetime Extension of Reactor block # 2

 

 

 

 

 

Client: AREVA / Germany; OKG EON Sweden

 

 

 

 

 

Location: Oskarshamn / Sweden

 

 

 

 

 

 

 

 

 

 

 

AUDI EA – Press

 

 

 

 

 

July 2013 – August 2013

 

 

 

 

 

07/2013 – 08/2013

 

 

 

 

 

Description: Erection of hydraulic tryout press for die manufacturing

 

 

 

 

 

Client: Schuller / Germany; AUDI Germany

 

 

 

 

 

Location: Ingolstadt / Germany

 

 

 

 

 

 

 

 

 

 

 

GoCell

 

 

 

 

 

September 2012 – June 2013

 

 

 

 

 

09/2012 – 06/2013

 

 

 

 

 

Description: Installation of the new Fibre line # 3

 

 

 

 

 

Client: AMEC / Canada; SAPPI / South Africa

 

 

 

 

 

Location: Ngodwana / South Africa

 

 

 

 

 

 

 

 

 

 

 

Rossmann

 

 

 

 

 

July 2012 – August 2012

 

 

 

 

 

07/2012 – 08/2012

 

 

 

 

 

Description: extension of the distribution Centre for a German’s chemist chain (entire control equipment and the material flow computer for a seven-aisle, double-depth high bay warehouse with pallet order picking, including automated restocking using 4 STC)

 

 

 

 

 

Client: BSS Bohneberg / Germany; Rossmann / Germany

 

 

 

 

 

Location: Landsberg  / Germany

 

 

 

 

 

 

 

 

 

 

 

Hans Kohler AG Zürich

 

 

 

 

 

May 2012 – June 2012

 

 

 

 

 

05/2012 – 06/2012

 

 

 

 

 

Description: Erection of an automatic storage and retrieval of containers, boxes and pallets with 8 automatic single Mast storages and picking station system.

 

 

 

 

 

Client: Stöcklin Logistik AG / Switzerland ; Hans Kohler AG Zürich / Switzerland

 

 

 

 

 

Location: Zürich / Switzerland

 

 

 

 

 

 

 

 

 

 

 

PPM Ltd.

 

 

 

 

 

November 2011

 

 

 

 

 

11/2011

 

 

 

 

 

Description: Documentation & dismantling of a hydraulic-tappet–production-system for relocation in China

 

 

 

 

 

Client: LMT – PPM Precision Products Manuf. Ltd. Shenzhen / China

 

 

 

 

 

Location: Wien / Austria

 

 

 

 

 

 

 

 

 

 

 

FORD Craiova

 

 

 

 

 

June 2011 – October 2011

 

 

 

 

 

06/2011 – 10/2011

 

 

 

 

 

Description: Erection of a new fully-automated under body and body framing system with more than 200 spot-welding – robotics.

 

 

 

 

 

Client: TMS GmbH / Austria; FORD Romania / Romania

 

 

 

 

 

Location: Craiova / Romania

 

 

 

 

 

 

 

 

 

 

 

LMT Metallurgy

 

 

 

 

 

April 2011 – May 2011

 

 

 

 

 

04/2011 – 05/2011

 

 

 

 

 

Description: relocation of two Induction melting furnace

 

 

 

 

 

Client: LMT – Metallurgie GmbH / Austria

 

 

 

 

 

Location: Steyrermühl / Austria

 

 

 

 

 

 

 

 

 

 

 

AUDI VK2100

 

 

 

 

 

December 2010 – February 2011

 

 

 

 

 

12/2010 – 02/2011

 

 

 

 

 

Description: Erection of hydraulic redraw press for automotive part production

 

 

 

 

 

Client: Müller Weingarten / Germany; AUDI Germany

 

 

 

 

 

Location: Ingolstadt / Germany

 

 

 

 

 

 

 

 

 

 

 

NEMAK

 

 

 

 

 

October 2010 – November 2010

 

 

 

 

 

10/2010 – 11/2010

 

 

 

 

 

Description: Documentation & dismantling of two Induction melting furnace for relocation

 

 

 

 

 

Client: LMT – Metallurgie GmbH / Austria; Nemak Linz GmbH / Austria

 

 

 

 

 

Location: Linz / Austria

 

 

 

 

 

 

 

 

 

 

 

CCGT - Pego

 

 

 

 

 

December 2009 – June 2010

 

 

 

 

 

12/2009 – 6/2010

 

 

 

 

 

Description: Erection of two 830MW single-shaft Combined Cycle gas turbines (CCGT)

 

 

 

 

 

Client: Siemens / Austria; Elecgas SA Pego / Portugal

 

 

 

 

 

Location: Abrantes / Portugal

 

 

 

 

 

 

 

 

 

 

 

NEM - Mongstadt

 

 

 

 

 

March 2009 – September 2009

 

 

 

 

 

3/2009 – 9/2009

 

 

 

 

 

Description: Erection of two waste heat boilers of a combined heat and power plant (CHP) based on a combined cycle.

 

 

 

 

 

Client: NEM BV. Leiden / Netherlands; DONG Energy / Norway

 

 

 

 

 

Location: Mongstad / Norway

 

 

 

 

 

 

 

 

 

 

 

DONG Energy - Mongstad

 

 

 

 

 

May 2008 – March 2009

 

 

 

 

 

5/2008 – 3/2009

 

 

 

 

 

Description: Erection of two GE Frame 9E - single-shaft- gas turbines each of 130MW with heat recovery units and a steam turbine.

 

 

 

 

 

Client: General Electrics; DONG Energy / Norway

 

 

 

 

 

Location: Mongstad / Norway

 

 

 

 

 

 

 

 

 

 

 

Landi Suisse

 

 

 

 

 

August 2007 – December 2007

 

 

 

 

 

8/2007 – 12/2007

 

 

 

 

 

Description: Erection of a complete automatic storage & distribution centre with automatic single mast high bay storage for 31500 pallets, transport system and picking stations system.

 

 

 

 

 

Client: Solomon Automation / Switzerland; Landi Schweiz / Switzerland

 

 

 

 

 

Location: Dotzigen / Switzerland

 

 

 

 

 

 

 

 

 

 

 

CCPP - Kårstø

 

 

 

 

 

October 2006 – July 2007

 

 

 

 

 

10/2006 – 7/2007

 

 

 

 

 

Description: Erection of a 418MW single-shaft Combined Cycle gas turbine (CCGT)

 

 

 

 

 

Client: Siemens / Germany; Statoil Hydro Kårstø / Norway

 

 

 

 

 

Location: Kårstø, Tysværvag / Norway

 

 

 

 

 

 

 

 

 

 

 

MA48 Wien

 

 

 

 

 

September 2006 – October 2006

 

 

 

 

 

9/2006 – 10/2006

 

 

 

 

 

Description: Installation of a slag processing system of thermal waste treatment

 

 

 

 

 

Client: vatron - voestalpine mechatronics / Austria; MA48 Wien / Austria

 

 

 

 

 

Location: Wien / Austria

 

 

 

 

 

 

 

 

 

 

 

EDEKA Bauerngut

 

 

 

 

 

March 2006 – July 2006

 

 

 

 

 

3/2006 – 7/2006

 

 

 

 

 

Description: Erection & installation of an automatic storage, distribution and retrieval of containers, boxes and pallets with automatic single Mast storages, picking station system and wrapping system.

 

 

 

 

 

Client: Salomon Automation / Austria; EDEKA Bauerngut GmbH / Germany

 

 

 

 

 

Location: Bückeburg / Germany

 

 

 

 

 

 

 

 

 

 

 

Louisenthal

 

 

 

 

 

November 2005 – March 2006

 

 

 

 

 

11/2005 – 3/2006

 

 

 

 

 

Description: General modification of the banknote - paper machine (paper money)

 

 

 

 

 

Client: Papierfabrik Louisenthal GmbH /Germany

 

 

 

 

 

Location: Gmund am Tegernsee / Germany

 

 

 

 

 

 

 

 

 

 

 

London Heathrow T5

 

 

 

 

 

April 2005 – November 2005

 

 

 

 

 

4/2005 – 11/2005

 

 

 

 

 

Description: London Heathrow Airport – Terminal 5: Installation of a complete fully automatic “early bag store” with the transport system and 30 automatic single mast cranes in a 30 aisle-high bay storage which can temporarily store up to 4.000 bags/luggage’s.

 

 

 

 

 

 

 

 

 

 

 

HO-A voestalpine

 

 

 

 

 

August 2003 – April 2005

 

 

 

 

 

8/2003 – 4/2005

 

 

 

 

 

Description: Dismantling and Rebuilding of the big “blast furnace A” in 100 days only.

 

 

 

 

 

Client: voestalpine AG Linz / Austria

 

 

 

 

 

Location: Linz / Austria

 

 

 

 

 

 

 

 

 

 

 

Shandong Bohui Paper

 

 

 

 

 

June 2003 – August 2003

 

 

 

 

 

6/2003 – 8/2003

 

 

 

 

 

Description: erection & commissioning of the paper machine 2

 

 

 

 

 

Client: Voith Paper / Austria; Shandong Bohui Paper / China

 

 

 

 

 

Location: Zibo, Qingdao / China

 

 

 

 

 

 

 

 

 

 

 

CCPP - Dogalgaz Santralli

 

 

 

 

 

April 2003 – June 2003

 

 

 

 

 

4/2003 – 6/2003

 

 

 

 

 

Description: Erection of two single-shaft Combined Cycle gas turbine (CCGT)

 

 

 

 

 

Client: VA Tech Hydro / Austria; Dogalgaz Ankara / Turkey

 

 

 

 

 

Location: Ankara / Turkey

 

 

 

 

 

 

 

 

 

 

 

NEXT

 

 

 

 

 

August 2002 – April 2003

 

 

 

 

 

8/2002 – 4/2003

 

 

 

 

 

Description: Extension of an existing storage and distribution centre with another 30 automatic single mast cranes in new high bay storages including the transport system and integration into the existing plant.

 

 

 

 

 

Client: Siemens Dematic / United Kingdom; NEXT Distribution plc / Unidet Kingdom

 

 

 

 

 

Location: Doncaster / United Kingdom

 

 

 

 

 

 

 

 

 

 

 

Kras d.d. Food Industry

 

 

 

 

 

August 2002

 

 

 

 

 

8/2002

 

 

 

 

 

Description: Erection & installation of an automatic pallet handling- and storage system with automatic single Mast cranes.

 

 

 

 

 

Client: Stöcklin / Switzerland; Kras d.d. Food Industry / Croatia

 

 

 

 

 

Location: Zagreb / Croatia

 

 

 

 

 

 

 

 

 

 

 

Sauer Polymertechnik

 

 

 

 

 

June 2002 – July2002

 

 

 

 

 

6/2002 – 7/2002

 

 

 

 

 

Description: Erection & installation and installation of three aisles and three 40m cranes in a high bay storage

 

 

 

 

 

Client: Viastore / Germany; Sauer Polymertechnik / Germany

 

 

 

 

 

Location: Föritz / Germany

 

 

 

 

 

 

 

 

 

 

 

Isovolta (Isoremo)

 

 

 

 

 

April 2002 - May 2002 & July 2002 – August 2002

 

 

 

 

 

4/2002 - 5/2002 & 7/2002 – 8/2002

 

 

 

 

 

Description: Erection & installation of impregnate channels (relocation from China)

 

 

 

 

 

Client: Isovolta / Austria

 

 

 

 

 

Location: Werndorf b. Graz / Austria

 

 

 

 

 

 

 

 

 

 

 

Neusiedler Papier AG

 

 

 

 

 

January 2002 - April 2002 & June 2002

 

 

 

 

 

1/2002 - 4/2002 & 6/2002

 

 

 

 

 

Description: Mechanical & Electrical modifications of different roller conveyors (pallet conveyors)

 

 

 

 

 

Client: Hörmann Logistic / Germany; Neusiedler Papier AG / Austria

 

 

 

 

 

Location: Ulmerfeld-Hausmening / Austria

 

 

 

 

 

 

 

 

 

 

 

Glunz AG

 

 

 

 

 

December 2001

 

 

 

 

 

12/2001

 

 

 

 

 

Description: installation of separating agent application

 

 

 

 

 

Client: Simpelkamp / Germany; Glunz AG / Germany

 

 

 

 

 

Location: Nettgau / Germany

 

 

 

 

 

 

 

 

 

 

 

Wattens Papier

 

 

 

 

 

November 2001 - December 2001

 

 

 

 

 

11/2001 – 12/2001

 

 

 

 

 

Description: modification of wet section (paper machine for cigarette paper)

 

 

 

 

 

Client: Wattens Papier / Austria

 

 

 

 

 

Location: Wattens / Austria

 

 

 

 

 

 

 

 

 

 

 

Asta Elektrodraht GmbH

 

 

 

 

 

October 2001

 

 

 

 

 

10/2001

 

 

 

 

 

Description: different modifications

 

 

 

 

 

Client: Asta Elektrodraht GmbH / Austria

 

 

 

 

 

Location: Oed / Austria

 

 

 

 

 

 

 

 

 

 

 

Cartiere Burgo SPA

 

 

 

 

 

September 2001

 

 

 

 

 

9/2001

 

 

 

 

 

Description: installation of two winders

 

 

 

 

 

Client: Jagenberg / Germany; Cartiere Burgo SPA / Italy

 

 

 

 

 

Location: Verzuolo / Italy

 

 

 

 

 

 

 

 

 

 

 

Kronospan Menznau

 

 

 

 

 

January 2001 - August 2001

 

 

 

 

 

1/2001 – 8/2001

 

 

 

 

 

Description: different modifications

 

 

 

 

 

Client: Kronospan / Switzerland

 

 

 

 

 

Location: Menznau / Switzerland

 

 

 

 

 

 

 

 

 

 

 

Wacker Chemie

 

 

 

 

 

September 2000 - December 2000

 

 

 

 

 

9/2000 - 12/2000

 

 

 

 

 

Description: errection and installation of one Gas turbine Frame 9E

 

 

 

 

 

Client: GE (General Electrics) / France; Wacker Chemie / Germany

 

 

 

 

 

Location: Burghausen / Germany

 

 

 

 

 

 

 

 

 

 

 

Berlingske Dagblade

 

 

 

 

 

August 2000 - September 2000

 

 

 

 

 

8/2000 - 9/2000

 

 

 

 

 

Description: errection and installation of newspaper conveying systems; inserting and stackers

 

 

 

 

 

Client: Müller Martini / Austria; Berlingske Dagblade / Denmark

 

 

 

 

 

Location: Copenhagen / Denmark

 

 

 

 

 

 

 

 

 

 

 

Nolte GmbH

 

 

 

 

 

April 2000 - August 2000

 

 

 

 

 

4/2000 - 8/2000

 

 

 

 

 

Description: errection and installation of a MDF line incl. all auxiliary plants

 

 

 

 

 

Client: Diffenbacher / Germany; Nolte GmbH / Germany

 

 

 

 

 

Location: Germersheim / Germany

 

 

 

 

 

 

 

 

 

 

 

Csepel Müvek II

 

 

 

 

 

November 1999 - April 2000

 

 

 

 

 

11/1999 - 4/2000

 

 

 

 

 

Description: MSR -  installation of two Gas turbines and one steam turbine (403 MW)

 

 

 

 

 

Client: VA-Tech Hydro / Austria; Powergen / United Kingdom

 

 

 

 

 

Location: Budapest / Hungary

 

 

 

 

 

 

 

 

 

 

 

Kaindl

 

 

 

 

 

September 1999 - November 1999

 

 

 

 

 

9/1999 - 11/1999

 

 

 

 

 

Description: errection and installation of a MDF line incl. all auxiliary plants

 

 

 

 

 

Client: Simpelkamp / Germany; Kaindl / Austria

 

 

 

 

 

Location: Salzburg / Austria

 

 

 

 

 

 

 

 

 

 

 

GEW - Köln (HKW - Merkenich)

 

 

 

 

 

April 1999 - September 1999

 

 

 

 

 

4/1999 - 9/1999

 

 

 

 

 

Description: MSR -  installation of a single shaft gas turbine

 

 

 

 

 

Client: Elin Energieversorgung / Austria; GEW Köln

 

 

 

 

 

Location: Köln - Niehl / Germany

 

 

 

 

 

 

 

 

 

 

 

Kronospan Menznau

 

 

 

 

 

January 1999 - April 1999

 

 

 

 

 

1/1999 – 4/1999

 

 

 

 

 

Description: errection and installation of a MDF line incl. all auxiliary plants

 

 

 

 

 

Client: Kronospan / Switzerland

 

 

 

 

 

Location: Menznau / Switzerland

 

 

 

 

 

 

 

 

 

 

 

Jiangsu Golden East Paper

 

 

 

 

 

December 1998 - January 1999

 

 

 

 

 

12/1998 - 1/1999

 

 

 

 

 

Description: errection and installation of paper roll conveyor system (2 paper machines)

 

 

 

 

 

Client: Lamb / Switzerland; Jiangsu Golden East Paper / China

 

 

 

 

 

Location: Dagang - Zhenjang / China

 

 

 

 

 

 

 

 

 

 

 

Kaufland Unterkaka

 

 

 

 

 

November 1998

 

 

 

 

 

11/1998

 

 

 

 

 

Description: Erection & installation of an automatic storage,  with automatic single mast cranes

 

 

 

 

 

Client: BSS Bohneberg / Germany; Kaufland / Germany

 

 

 

 

 

Location: Unterkaka / Germany

 

 

 

 

 

 

 

 

 

 

 

Kronospan Chirk

 

 

 

 

 

October 1998 - November 1998

 

 

 

 

 

10/1998 - 11/1998

 

 

 

 

 

Description: errection and installation of a wood board-press incl. auxiliary plants

 

 

 

 

 

Client: Simpelkamp / Germany; Kronospan / United Kingdom

 

 

 

 

 

Location: Chirk - Wrexham / United Kingdom

 

 

 

 

 

 

 

 

 

 

 

Kohler Flexible Packaging

 

 

 

 

 

July 1998 - September 1998

 

 

 

 

 

7/1998 - 9/1998

 

 

 

 

 

Description: errection and installation of laminating line for food-packaging

 

 

 

 

 

Client: ER-WE-PA - Davis Standard / Germany; Kohler Flexible / South Africa

 

 

 

 

 

Location: Pinetown - Durban / South Africa

 

 

 

 

 

 

 

 

 

 

 

SCA Thatcham

 

 

 

 

 

May 1998 - June 1998

 

 

 

 

 

5/1998 - 6/1998

 

 

 

 

 

Description: errection and installation of corrugated cardboard line

 

 

 

 

 

Client: BHS - Corrugated / Germany; SCA Thatcham / United Kingdom

 

 

 

 

 

Location: Newburry / United Kingdom

 

 

 

 

 

 

 

 

 

 

 

HCE Sieger GmbH

 

 

 

 

 

April 1998

 

 

 

 

 

4/1998

 

 

 

 

 

Description: errection and installation of corrugated cardboard line

 

 

 

 

 

Client: BHS - Corrugated / Germany; HCE Sieger / Germany

 

 

 

 

 

Location: Hannau / Germany

 

 

 

 

 

 

 

 

 

 

 

Kronotex

 

 

 

 

 

February 1998 - April 1998

 

 

 

 

 

2/1998 - 4/1998

 

 

 

 

 

Description: errection and installation of two KT- presses incl. auxiliary plants

 

 

 

 

 

Client: Simpelkamp / Germany; Kronotex / Germany

 

 

 

 

 

Location: Heiligengrabe / Germany

 

 

 

 

 

 

 

 

 

 

 

Otor

 

 

 

 

 

December 1997

 

 

 

 

 

12/1997

 

 

 

 

 

Description: errection and installation of corrugated cardboard line

 

 

 

 

 

Client: BHS - Corrugated / Germany; Otor Bretagne / France

 

 

 

 

 

Location: Charhaix - Finistere / France

 

 

 

 

 

 

 

 

 

 

 

Alusiusse Singen

 

 

 

 

 

December 1997

 

 

 

 

 

12/1997

 

 

 

 

 

Description: installation of aluminium - rollers

 

 

 

 

 

Client: ER-WE-PA - Davis Standard / Germany; Alusiusse Singen / Germany

 

 

 

 

 

Location: Singen / Germany

 

 

 

 

 

 

 

 

 

 

 

Panasonic Hamburg

 

 

 

 

 

October 1997 - November 1997

 

 

 

 

 

10/1997 - 11/1997

 

 

 

 

 

Description: Erection & installation of an automatic storage,  with automatic single mast cranes

 

 

 

 

 

Client: BSS Bohneberg / Germany; Panasonic Hamburg / Germany

 

 

 

 

 

Location: Hamburg / Germany

 

 

 

 

 

 

 

 

 

 

 

Nobilia

 

 

 

 

 

September 1997 - October 1997

 

 

 

 

 

9/1997 - 10/1997

 

 

 

 

 

Description: Erection & installation of an automatic storage,  with automatic single mast cranes

 

 

 

 

 

Client: Haushahn / Germany; Nobilia / Germany

 

 

 

 

 

Location: Verl / Germany

 

 

 

 

 

 

 

 

 

 

 

Kronospan Chirk

 

 

 

 

 

June 1997 - August 1997

 

 

 

 

 

6/1997 - 8/1997

 

 

 

 

 

Description: installation of an electrical filter

 

 

 

 

 

Client: Hydro Air / Austria; Kronospan / United Kingdom

 

 

 

 

 

Location: Chirk - Wrexham / United Kingdom

 

 

 

 

 

 

 

 

 

 

 

KNP Leykam

 

 

 

 

 

June 1997

 

 

 

 

 

6/1997

 

 

 

 

 

Description: errection and installation of a paper machine (PM11)

 

 

 

 

 

Client: KNP Leykam / Austria

 

 

 

 

 

Location: Gratkorn / Austria

 

 

 

 

 

 

 

 

 

 

 

Patria Papier 

 

 

 

 

 

April 1997 - May 1997

 

 

 

 

 

4/1997 - 5/1997

 

 

 

 

 

Description: different modifications

 

 

 

 

 

Client: Patria Papier Frantschach / Austria

 

 

 

 

 

Location: Frantschach / Austria

 

 

 

 

 

 

 

 

 

 

 

Magna Eybl Durmont

 

 

 

 

 

February 1997 - April 1997

 

 

 

 

 

2/1997 - 4/1997

 

 

 

 

 

Description: different modifications

 

 

 

 

 

Client: Magna Eybl Durmont / Austria

 

 

 

 

 

Location: Ebergassing / Austria

 

 

 

 

 

 

 

 

 

 

 

Parkhaus 1

 

 

 

 

 

November 1996 - January 1997

 

 

 

 

 

11/1996 - 01/1997

 

 

 

 

 

Description: installation of a full-automatic parkinghouse

 

 

 

 

 

Client: Siemens Nürnberg  / Germany

 

 

 

 

 

Location: Wien / Austria