part of following projects:
Sarpi RK1
|
April 2023 - today
|
4/2023 – today
|
Description: project management (on-site) of a E-I&C - "waste to energy" - project
|
Client:
Griesemann Gruppe / Sarpi Deutschland GmbH
|
Location: Marl / Germany
|
PM2 - Obbola
|
September 2021 – February 2023
|
9/2021 – 2/2023
|
Description: site management at the new PM2 (paper machine, Kraftliner; I&C - installation)
|
Client: Christof Industries Austria / Voith Paper Germany / SCA Obbola
|
Location: Obbola / Sweden
|
CSL - Behring
|
August 2020 – August 2021
|
8/2020 – 08/2021
|
Description: erecting of a new pharmaceutical plant
|
Client: Jacobs Engineering / CSL Behring
|
Location: Lengnau / Switzerland
|
|
COVID19 lockdown
|
April 2020 - July 2020
|
4/2020 – 7/2020
|
Description: economic stall due to the virus - pandemic
|
Client: ---
|
Location: ---
|
|
CalPlant1
|
June 2019 – March 2020
|
6/2019 – 3/2020
|
Description: electrical installation, of the world's 1st rice strow-based MDF plant
|
Client: KS Industrial Corp. / CalPlant1 LCC
|
Location: Willows, California, USA
|
|
BillerudKorsnäs AB
|
March 2018 – May 2019
|
3/2018 – 05/2019
|
Description: electrical installation, next generation - KM7
|
Client: BillerudKorsnäs
|
Location: Grums / Sweden
|
|
Pina S.A. (Losán Grupo)
|
November 2017 – February 2018
|
11/2017 - 2/2018
|
Description: electrical erection of a pressboard line with all auxilliaries
|
Client:
Kurt
Schuhmacher / Pina S.A. (Losán Grupo)
|
Location: Fuentens (Cuenca) / Spain
|
|
Porsche
|
July 2017 – August 2017
|
7/2016 – 8/2017
|
Description: change of electric monorail system (EMS) and modifying of skillet conveyors
|
Client: DÜRR /Germany; Porsche / Germany
|
Location: Zuffenhausen / Germany
|
|
Metsä Fibre Oy - pulp drying line
|
August 2016 – June 2017
|
8/2016 - 6/2017
|
Description: electrical installation of a pulp drying line and baling line
|
Client: Metsä Fibre Oy / Finland (in partnership with Valmet / Finland)
|
Location: Äänekoski / Finland
|
|
|
|
|
|
|
|
|
|
|
|
|
Tata Steel Ijumiden BV - hot strip mill 2
|
|
|
|
|
|
July 2016
|
|
|
|
|
|
7/2016
|
|
|
|
|
|
Description: modification of hot strip mill 2 (coiler 1&2) colission-list
|
|
|
|
|
|
Client: Primetals Technologies / Austria; SMS group GmbH / Germany; Tata Steel Ijumiden BV / Netherlands
|
|
|
|
|
|
Location: Velsen-Noord / Netherlands
|
|
|
|
|
|
|
|
|
|
|
|
Tata Steel Ijumiden BV - hot strip mill 2
|
|
|
|
|
|
July 2016
|
|
|
|
|
|
7/2016
|
|
|
|
|
|
Description: modification of hot strip mill 2 (coiler 1&2) colission-list
|
|
|
|
|
|
Client: Primetals Technologies / Austria; SMS group GmbH / Germany; Tata Steel Ijumiden BV / Netherlands
|
|
|
|
|
|
Location: Velsen-Noord / Netherlands
|
|
|
|
|
|
|
|
|
|
|
|
GE-General Electrics - Birr 4 (former ALSTOM)
|
|
|
|
|
|
July 2015 – June 2016
|
|
|
|
|
|
7/2015 - 6/2016
|
|
|
|
|
|
Description: Erection of the Gas turbine GT36 prototype – Test Centre
|
|
|
|
|
|
Client: GE - Switzerland and Ansaldo Energia former Alstom Switzerland AG
|
|
|
|
|
|
Location: Birr / Switzerland
|
|
|
|
|
|
|
|
|
|
|
|
Kronospan Burgos (Line 6)
|
|
|
|
|
|
February 2015 – June 2015
|
|
|
|
|
|
2/2015 – 6/2015
|
|
|
|
|
|
Description: dismantling (relocation) of a Küsters wood board press incl. forming and finishing line.
|
|
|
|
|
|
Client:
Kronospan /
Spain; Kronospan / Serbia
|
|
|
|
|
|
Location: Burgos / Spain
|
|
|
|
|
|
|
|
|
|
|
|
MDF - Hallein
|
|
|
|
|
|
September 2014 – January 2015
|
|
|
|
|
|
9/2014 – 1/2015
|
|
|
|
|
|
Description: dismantling for relocation of a complete MDF- factory.
|
|
|
|
|
|
Client: Kronoplus Technical AG, Switzerland
|
|
|
|
|
|
Location: Hallein / Austria
|
|
|
|
|
|
|
|
|
|
|
|
Rittal Haiger
|
|
|
|
|
|
August 2014
|
|
|
|
|
|
8/2014
|
|
|
|
|
|
Description: Erection of an automatic high bay-warehouse (8 aisles), automated small parts storage (6 aisles) and complete boxes and pallets - conveying
system.
|
|
|
|
|
|
Client: BSS – Bohneberg / Germany; Rittal / Germany
|
|
|
|
|
|
Location: Haiger / Germany
|
|
|
|
|
|
|
|
|
|
|
|
PLEX 2
|
|
|
|
|
|
September 2013 – July 2014
|
|
|
|
|
|
9/2013 – 7/2014
|
|
|
|
|
|
Description: Modification and Plant Lifetime Extension of Reactor block # 2
|
|
|
|
|
|
Client: AREVA / Germany; OKG EON Sweden
|
|
|
|
|
|
Location: Oskarshamn / Sweden
|
|
|
|
|
|
|
|
|
|
|
|
AUDI EA – Press
|
|
|
|
|
|
July 2013 – August 2013
|
|
|
|
|
|
07/2013 – 08/2013
|
|
|
|
|
|
Description: Erection of hydraulic tryout press for die manufacturing
|
|
|
|
|
|
Client: Schuller / Germany; AUDI Germany
|
|
|
|
|
|
Location: Ingolstadt / Germany
|
|
|
|
|
|
|
|
|
|
|
|
GoCell
|
|
|
|
|
|
September 2012 – June 2013
|
|
|
|
|
|
09/2012 – 06/2013
|
|
|
|
|
|
Description: Installation of the new Fibre line # 3
|
|
|
|
|
|
Client: AMEC / Canada; SAPPI / South Africa
|
|
|
|
|
|
Location: Ngodwana / South Africa
|
|
|
|
|
|
|
|
|
|
|
|
Rossmann
|
|
|
|
|
|
July 2012 – August 2012
|
|
|
|
|
|
07/2012 – 08/2012
|
|
|
|
|
|
Description: extension of the distribution Centre for a German’s chemist chain (entire control equipment and the material flow computer for a seven-aisle,
double-depth high bay warehouse with pallet order picking, including automated restocking using 4 STC)
|
|
|
|
|
|
Client: BSS Bohneberg / Germany; Rossmann / Germany
|
|
|
|
|
|
Location: Landsberg / Germany
|
|
|
|
|
|
|
|
|
|
|
|
Hans Kohler AG Zürich
|
|
|
|
|
|
May 2012 – June 2012
|
|
|
|
|
|
05/2012 – 06/2012
|
|
|
|
|
|
Description: Erection of an automatic storage and retrieval of containers, boxes and pallets with 8 automatic single Mast storages and picking station
system.
|
|
|
|
|
|
Client:
Stöcklin Logistik
AG / Switzerland ; Hans Kohler AG Zürich / Switzerland
|
|
|
|
|
|
Location: Zürich / Switzerland
|
|
|
|
|
|
|
|
|
|
|
|
PPM Ltd.
|
|
|
|
|
|
November 2011
|
|
|
|
|
|
11/2011
|
|
|
|
|
|
Description: Documentation & dismantling of a hydraulic-tappet–production-system for relocation in China
|
|
|
|
|
|
Client: LMT – PPM Precision Products Manuf. Ltd. Shenzhen / China
|
|
|
|
|
|
Location: Wien / Austria
|
|
|
|
|
|
|
|
|
|
|
|
FORD Craiova
|
|
|
|
|
|
June 2011 – October 2011
|
|
|
|
|
|
06/2011 – 10/2011
|
|
|
|
|
|
Description: Erection of a new fully-automated under body and body framing system with more than 200 spot-welding – robotics.
|
|
|
|
|
|
Client: TMS GmbH / Austria; FORD Romania / Romania
|
|
|
|
|
|
Location: Craiova / Romania
|
|
|
|
|
|
|
|
|
|
|
|
LMT Metallurgy
|
|
|
|
|
|
April 2011 – May 2011
|
|
|
|
|
|
04/2011 – 05/2011
|
|
|
|
|
|
Description: relocation of two Induction melting furnace
|
|
|
|
|
|
Client:
LMT –
Metallurgie GmbH / Austria
|
|
|
|
|
|
Location: Steyrermühl / Austria
|
|
|
|
|
|
|
|
|
|
|
|
AUDI VK2100
|
|
|
|
|
|
December 2010 – February 2011
|
|
|
|
|
|
12/2010 – 02/2011
|
|
|
|
|
|
Description: Erection of hydraulic redraw press for automotive part production
|
|
|
|
|
|
Client: Müller Weingarten / Germany; AUDI Germany
|
|
|
|
|
|
Location: Ingolstadt / Germany
|
|
|
|
|
|
|
|
|
|
|
|
NEMAK
|
|
|
|
|
|
October 2010 – November 2010
|
|
|
|
|
|
10/2010 – 11/2010
|
|
|
|
|
|
Description: Documentation & dismantling of two Induction melting furnace for relocation
|
|
|
|
|
|
Client: LMT – Metallurgie GmbH / Austria; Nemak Linz GmbH / Austria
|
|
|
|
|
|
Location: Linz / Austria
|
|
|
|
|
|
|
|
|
|
|
|
CCGT - Pego
|
|
|
|
|
|
December 2009 – June 2010
|
|
|
|
|
|
12/2009 – 6/2010
|
|
|
|
|
|
Description: Erection of two 830MW single-shaft Combined Cycle gas turbines (CCGT)
|
|
|
|
|
|
Client: Siemens / Austria; Elecgas SA Pego / Portugal
|
|
|
|
|
|
Location: Abrantes / Portugal
|
|
|
|
|
|
|
|
|
|
|
|
NEM - Mongstadt
|
|
|
|
|
|
March 2009 – September 2009
|
|
|
|
|
|
3/2009 – 9/2009
|
|
|
|
|
|
Description: Erection of two waste heat boilers of a combined heat and power plant (CHP) based on a combined cycle.
|
|
|
|
|
|
Client: NEM BV. Leiden / Netherlands; DONG Energy / Norway
|
|
|
|
|
|
Location: Mongstad / Norway
|
|
|
|
|
|
|
|
|
|
|
|
DONG Energy - Mongstad
|
|
|
|
|
|
May 2008 – March 2009
|
|
|
|
|
|
5/2008 – 3/2009
|
|
|
|
|
|
Description: Erection of two GE Frame 9E - single-shaft- gas turbines each of 130MW with heat recovery units and a steam turbine.
|
|
|
|
|
|
Client: General Electrics; DONG Energy / Norway
|
|
|
|
|
|
Location: Mongstad / Norway
|
|
|
|
|
|
|
|
|
|
|
|
Landi Suisse
|
|
|
|
|
|
August 2007 – December 2007
|
|
|
|
|
|
8/2007 – 12/2007
|
|
|
|
|
|
Description: Erection of a complete automatic storage & distribution centre with automatic single mast high bay storage for 31500 pallets, transport system
and picking stations system.
|
|
|
|
|
|
Client:
Solomon
Automation / Switzerland; Landi Schweiz / Switzerland
|
|
|
|
|
|
Location: Dotzigen / Switzerland
|
|
|
|
|
|
|
|
|
|
|
|
CCPP - Kårstø
|
|
|
|
|
|
October 2006 – July 2007
|
|
|
|
|
|
10/2006 – 7/2007
|
|
|
|
|
|
Description: Erection of a 418MW single-shaft Combined Cycle gas turbine (CCGT)
|
|
|
|
|
|
Client: Siemens / Germany; Statoil Hydro Kårstø / Norway
|
|
|
|
|
|
Location: Kårstø, Tysværvag / Norway
|
|
|
|
|
|
|
|
|
|
|
|
MA48 Wien
|
|
|
|
|
|
September 2006 – October 2006
|
|
|
|
|
|
9/2006 – 10/2006
|
|
|
|
|
|
Description: Installation of a slag processing system of thermal waste treatment
|
|
|
|
|
|
Client: vatron - voestalpine mechatronics / Austria; MA48 Wien / Austria
|
|
|
|
|
|
Location: Wien / Austria
|
|
|
|
|
|
|
|
|
|
|
|
EDEKA Bauerngut
|
|
|
|
|
|
March 2006 – July 2006
|
|
|
|
|
|
3/2006 – 7/2006
|
|
|
|
|
|
Description: Erection & installation of an automatic storage, distribution and retrieval of containers, boxes and pallets with automatic single Mast
storages, picking station system and wrapping system.
|
|
|
|
|
|
Client: Salomon Automation / Austria; EDEKA Bauerngut GmbH / Germany
|
|
|
|
|
|
Location: Bückeburg / Germany
|
|
|
|
|
|
|
|
|
|
|
|
Louisenthal
|
|
|
|
|
|
November 2005 – March 2006
|
|
|
|
|
|
11/2005 – 3/2006
|
|
|
|
|
|
Description: General modification of the banknote - paper machine (paper money)
|
|
|
|
|
|
Client:
Papierfabrik
Louisenthal GmbH /Germany
|
|
|
|
|
|
Location:
Gmund
am Tegernsee / Germany
|
|
|
|
|
|
|
|
|
|
|
|
London Heathrow T5
|
|
|
|
|
|
April 2005 – November 2005
|
|
|
|
|
|
4/2005 – 11/2005
|
|
|
|
|
|
Description: London Heathrow Airport – Terminal 5: Installation of a complete fully automatic “early bag store” with the transport system and 30 automatic
single mast cranes in a 30 aisle-high bay storage which can temporarily store up to 4.000 bags/luggage’s.
|
|
|
|
|
|
|
|
|
|
|
|
HO-A voestalpine
|
|
|
|
|
|
August 2003 – April 2005
|
|
|
|
|
|
8/2003 – 4/2005
|
|
|
|
|
|
Description: Dismantling and Rebuilding of the big “blast furnace A” in 100 days only.
|
|
|
|
|
|
Client:
voestalpine AG
Linz / Austria
|
|
|
|
|
|
Location: Linz / Austria
|
|
|
|
|
|
|
|
|
|
|
|
Shandong Bohui Paper
|
|
|
|
|
|
June 2003 – August 2003
|
|
|
|
|
|
6/2003 – 8/2003
|
|
|
|
|
|
Description: erection & commissioning of the paper machine 2
|
|
|
|
|
|
Client: Voith Paper / Austria; Shandong Bohui Paper / China
|
|
|
|
|
|
Location: Zibo, Qingdao / China
|
|
|
|
|
|
|
|
|
|
|
|
CCPP - Dogalgaz Santralli
|
|
|
|
|
|
April 2003 – June 2003
|
|
|
|
|
|
4/2003 – 6/2003
|
|
|
|
|
|
Description: Erection of two single-shaft Combined Cycle gas turbine (CCGT)
|
|
|
|
|
|
Client: VA Tech Hydro / Austria; Dogalgaz Ankara / Turkey
|
|
|
|
|
|
Location: Ankara / Turkey
|
|
|
|
|
|
|
|
|
|
|
|
NEXT
|
|
|
|
|
|
August 2002 – April 2003
|
|
|
|
|
|
8/2002 – 4/2003
|
|
|
|
|
|
Description: Extension of an existing storage and distribution centre with another 30 automatic single mast cranes in new high bay storages including the
transport system and integration into the existing plant.
|
|
|
|
|
|
Client: Siemens Dematic / United Kingdom; NEXT Distribution plc / Unidet Kingdom
|
|
|
|
|
|
Location: Doncaster / United Kingdom
|
|
|
|
|
|
|
|
|
|
|
|
Kras d.d. Food Industry
|
|
|
|
|
|
August 2002
|
|
|
|
|
|
8/2002
|
|
|
|
|
|
Description: Erection & installation of an automatic pallet handling- and storage system with automatic single Mast cranes.
|
|
|
|
|
|
Client: Stöcklin / Switzerland; Kras d.d. Food Industry / Croatia
|
|
|
|
|
|
Location: Zagreb / Croatia
|
|
|
|
|
|
|
|
|
|
|
|
Sauer Polymertechnik
|
|
|
|
|
|
June 2002 – July2002
|
|
|
|
|
|
6/2002 – 7/2002
|
|
|
|
|
|
Description: Erection & installation and installation of three aisles and three 40m cranes in a high bay storage
|
|
|
|
|
|
Client: Viastore / Germany; Sauer Polymertechnik / Germany
|
|
|
|
|
|
Location: Föritz / Germany
|
|
|
|
|
|
|
|
|
|
|
|
Isovolta (Isoremo)
|
|
|
|
|
|
April 2002 - May 2002 & July 2002 – August 2002
|
|
|
|
|
|
4/2002 - 5/2002 & 7/2002 – 8/2002
|
|
|
|
|
|
Description: Erection & installation of impregnate channels (relocation from China)
|
|
|
|
|
|
Client: Isovolta / Austria
|
|
|
|
|
|
Location: Werndorf b. Graz / Austria
|
|
|
|
|
|
|
|
|
|
|
|
Neusiedler Papier AG
|
|
|
|
|
|
January 2002 - April 2002 & June 2002
|
|
|
|
|
|
1/2002 - 4/2002 & 6/2002
|
|
|
|
|
|
Description: Mechanical & Electrical modifications of different roller conveyors (pallet conveyors)
|
|
|
|
|
|
Client:
Hörmann Logistic
/ Germany; Neusiedler Papier AG / Austria
|
|
|
|
|
|
Location: Ulmerfeld-Hausmening / Austria
|
|
|
|
|
|
|
|
|
|
|
|
Glunz AG
|
|
|
|
|
|
December 2001
|
|
|
|
|
|
12/2001
|
|
|
|
|
|
Description: installation of separating agent application
|
|
|
|
|
|
Client: Simpelkamp / Germany; Glunz AG / Germany
|
|
|
|
|
|
Location: Nettgau / Germany
|
|
|
|
|
|
|
|
|
|
|
|
Wattens Papier
|
|
|
|
|
|
November 2001 - December 2001
|
|
|
|
|
|
11/2001 – 12/2001
|
|
|
|
|
|
Description: modification of wet section (paper machine for cigarette paper)
|
|
|
|
|
|
Client: Wattens Papier / Austria
|
|
|
|
|
|
Location: Wattens / Austria
|
|
|
|
|
|
|
|
|
|
|
|
Asta Elektrodraht GmbH
|
|
|
|
|
|
October 2001
|
|
|
|
|
|
10/2001
|
|
|
|
|
|
Description: different modifications
|
|
|
|
|
|
Client:
Asta
Elektrodraht GmbH / Austria
|
|
|
|
|
|
Location: Oed / Austria
|
|
|
|
|
|
|
|
|
|
|
|
Cartiere Burgo SPA
|
|
|
|
|
|
September 2001
|
|
|
|
|
|
9/2001
|
|
|
|
|
|
Description: installation of two winders
|
|
|
|
|
|
Client: Jagenberg / Germany; Cartiere Burgo SPA / Italy
|
|
|
|
|
|
Location: Verzuolo / Italy
|
|
|
|
|
|
|
|
|
|
|
|
Kronospan Menznau
|
|
|
|
|
|
January 2001 - August 2001
|
|
|
|
|
|
1/2001 – 8/2001
|
|
|
|
|
|
Description: different modifications
|
|
|
|
|
|
Client: Kronospan / Switzerland
|
|
|
|
|
|
Location: Menznau / Switzerland
|
|
|
|
|
|
|
|
|
|
|
|
Wacker Chemie
|
|
|
|
|
|
September 2000 - December 2000
|
|
|
|
|
|
9/2000 - 12/2000
|
|
|
|
|
|
Description: errection and installation of one Gas turbine Frame 9E
|
|
|
|
|
|
Client: GE (General Electrics) / France; Wacker Chemie / Germany
|
|
|
|
|
|
Location: Burghausen / Germany
|
|
|
|
|
|
|
|
|
|
|
|
Berlingske Dagblade
|
|
|
|
|
|
August 2000 - September 2000
|
|
|
|
|
|
8/2000 - 9/2000
|
|
|
|
|
|
Description: errection and installation of newspaper conveying systems; inserting and stackers
|
|
|
|
|
|
Client:
Müller Martini /
Austria; Berlingske Dagblade / Denmark
|
|
|
|
|
|
Location: Copenhagen / Denmark
|
|
|
|
|
|
|
|
|
|
|
|
Nolte GmbH
|
|
|
|
|
|
April 2000 - August 2000
|
|
|
|
|
|
4/2000 - 8/2000
|
|
|
|
|
|
Description: errection and installation of a MDF line incl. all auxiliary plants
|
|
|
|
|
|
Client: Diffenbacher / Germany; Nolte GmbH / Germany
|
|
|
|
|
|
Location: Germersheim / Germany
|
|
|
|
|
|
|
|
|
|
|
|
Csepel Müvek II
|
|
|
|
|
|
November 1999 - April 2000
|
|
|
|
|
|
11/1999 - 4/2000
|
|
|
|
|
|
Description: MSR - installation of two Gas turbines and one steam turbine (403 MW)
|
|
|
|
|
|
Client: VA-Tech Hydro / Austria; Powergen / United Kingdom
|
|
|
|
|
|
Location: Budapest / Hungary
|
|
|
|
|
|
|
|
|
|
|
|
Kaindl
|
|
|
|
|
|
September 1999 - November 1999
|
|
|
|
|
|
9/1999 - 11/1999
|
|
|
|
|
|
Description: errection and installation of a MDF line incl. all auxiliary plants
|
|
|
|
|
|
Client: Simpelkamp / Germany; Kaindl / Austria
|
|
|
|
|
|
Location: Salzburg / Austria
|
|
|
|
|
|
|
|
|
|
|
|
GEW - Köln (HKW - Merkenich)
|
|
|
|
|
|
April 1999 - September 1999
|
|
|
|
|
|
4/1999 - 9/1999
|
|
|
|
|
|
Description: MSR - installation of a single shaft gas turbine
|
|
|
|
|
|
Client: Elin
Energieversorgung / Austria; GEW Köln
|
|
|
|
|
|
Location: Köln - Niehl / Germany
|
|
|
|
|
|
|
|
|
|
|
|
Kronospan Menznau
|
|
|
|
|
|
January 1999 - April 1999
|
|
|
|
|
|
1/1999 – 4/1999
|
|
|
|
|
|
Description: errection and installation of a MDF line incl. all auxiliary plants
|
|
|
|
|
|
Client: Kronospan / Switzerland
|
|
|
|
|
|
Location: Menznau / Switzerland
|
|
|
|
|
|
|
|
|
|
|
|
Jiangsu Golden East Paper
|
|
|
|
|
|
December 1998 - January 1999
|
|
|
|
|
|
12/1998 - 1/1999
|
|
|
|
|
|
Description: errection and installation of paper roll conveyor system (2 paper machines)
|
|
|
|
|
|
Client: Lamb / Switzerland; Jiangsu Golden East Paper / China
|
|
|
|
|
|
Location: Dagang - Zhenjang / China
|
|
|
|
|
|
|
|
|
|
|
|
Kaufland Unterkaka
|
|
|
|
|
|
November 1998
|
|
|
|
|
|
11/1998
|
|
|
|
|
|
Description: Erection & installation of an automatic storage, with automatic single mast cranes
|
|
|
|
|
|
Client: BSS Bohneberg / Germany; Kaufland / Germany
|
|
|
|
|
|
Location: Unterkaka / Germany
|
|
|
|
|
|
|
|
|
|
|
|
Kronospan Chirk
|
|
|
|
|
|
October 1998 - November 1998
|
|
|
|
|
|
10/1998 - 11/1998
|
|
|
|
|
|
Description: errection and installation of a wood board-press incl. auxiliary plants
|
|
|
|
|
|
Client: Simpelkamp / Germany; Kronospan / United Kingdom
|
|
|
|
|
|
Location: Chirk - Wrexham / United Kingdom
|
|
|
|
|
|
|
|
|
|
|
|
Kohler Flexible Packaging
|
|
|
|
|
|
July 1998 - September 1998
|
|
|
|
|
|
7/1998 - 9/1998
|
|
|
|
|
|
Description: errection and installation of laminating line for food-packaging
|
|
|
|
|
|
Client: ER-WE-PA - Davis Standard / Germany; Kohler Flexible / South Africa
|
|
|
|
|
|
Location: Pinetown - Durban / South Africa
|
|
|
|
|
|
|
|
|
|
|
|
SCA Thatcham
|
|
|
|
|
|
May 1998 - June 1998
|
|
|
|
|
|
5/1998 - 6/1998
|
|
|
|
|
|
Description: errection and installation of corrugated cardboard line
|
|
|
|
|
|
Client: BHS - Corrugated / Germany; SCA Thatcham / United Kingdom
|
|
|
|
|
|
Location: Newburry / United Kingdom
|
|
|
|
|
|
|
|
|
|
|
|
HCE Sieger GmbH
|
|
|
|
|
|
April 1998
|
|
|
|
|
|
4/1998
|
|
|
|
|
|
Description: errection and installation of corrugated cardboard line
|
|
|
|
|
|
Client: BHS - Corrugated / Germany; HCE Sieger / Germany
|
|
|
|
|
|
Location: Hannau / Germany
|
|
|
|
|
|
|
|
|
|
|
|
Kronotex
|
|
|
|
|
|
February 1998 - April 1998
|
|
|
|
|
|
2/1998 - 4/1998
|
|
|
|
|
|
Description: errection and installation of two KT- presses incl. auxiliary plants
|
|
|
|
|
|
Client: Simpelkamp / Germany; Kronotex / Germany
|
|
|
|
|
|
Location: Heiligengrabe / Germany
|
|
|
|
|
|
|
|
|
|
|
|
Otor
|
|
|
|
|
|
December 1997
|
|
|
|
|
|
12/1997
|
|
|
|
|
|
Description: errection and installation of corrugated cardboard line
|
|
|
|
|
|
Client: BHS - Corrugated / Germany; Otor Bretagne / France
|
|
|
|
|
|
Location: Charhaix - Finistere / France
|
|
|
|
|
|
|
|
|
|
|
|
Alusiusse Singen
|
|
|
|
|
|
December 1997
|
|
|
|
|
|
12/1997
|
|
|
|
|
|
Description: installation of aluminium - rollers
|
|
|
|
|
|
Client: ER-WE-PA - Davis Standard / Germany; Alusiusse Singen / Germany
|
|
|
|
|
|
Location: Singen / Germany
|
|
|
|
|
|
|
|
|
|
|
|
Panasonic Hamburg
|
|
|
|
|
|
October 1997 - November 1997
|
|
|
|
|
|
10/1997 - 11/1997
|
|
|
|
|
|
Description: Erection & installation of an automatic storage, with automatic single mast cranes
|
|
|
|
|
|
Client: BSS Bohneberg / Germany; Panasonic Hamburg / Germany
|
|
|
|
|
|
Location: Hamburg / Germany
|
|
|
|
|
|
|
|
|
|
|
|
Nobilia
|
|
|
|
|
|
September 1997 - October 1997
|
|
|
|
|
|
9/1997 - 10/1997
|
|
|
|
|
|
Description: Erection & installation of an automatic storage, with automatic single mast cranes
|
|
|
|
|
|
Client: Haushahn / Germany; Nobilia / Germany
|
|
|
|
|
|
Location: Verl / Germany
|
|
|
|
|
|
|
|
|
|
|
|
Kronospan Chirk
|
|
|
|
|
|
June 1997 - August 1997
|
|
|
|
|
|
6/1997 - 8/1997
|
|
|
|
|
|
Description: installation of an electrical filter
|
|
|
|
|
|
Client: Hydro Air / Austria; Kronospan / United Kingdom
|
|
|
|
|
|
Location: Chirk - Wrexham / United Kingdom
|
|
|
|
|
|
|
|
|
|
|
|
KNP Leykam
|
|
|
|
|
|
June 1997
|
|
|
|
|
|
6/1997
|
|
|
|
|
|
Description: errection and installation of a paper machine (PM11)
|
|
|
|
|
|
Client: KNP Leykam / Austria
|
|
|
|
|
|
Location: Gratkorn / Austria
|
|
|
|
|
|
|
|
|
|
|
|
Patria Papier
|
|
|
|
|
|
April 1997 - May 1997
|
|
|
|
|
|
4/1997 - 5/1997
|
|
|
|
|
|
Description: different modifications
|
|
|
|
|
|
Client: Patria Papier Frantschach / Austria
|
|
|
|
|
|
Location: Frantschach / Austria
|
|
|
|
|
|
|
|
|
|
|
|
Magna Eybl Durmont
|
|
|
|
|
|
February 1997 - April 1997
|
|
|
|
|
|
2/1997 - 4/1997
|
|
|
|
|
|
Description: different modifications
|
|
|
|
|
|
Client: Magna Eybl Durmont / Austria
|
|
|
|
|
|
Location: Ebergassing / Austria
|
|
|
|
|
|
|
|
|
|
|
|
Parkhaus 1
|
|
|
|
|
|
November 1996 - January 1997
|
|
|
|
|
|
11/1996 - 01/1997
|
|
|
|
|
|
Description: installation of a full-automatic parkinghouse
|
|
|
|
|
|
Client: Siemens Nürnberg / Germany
|
|
|
|
|
|
Location: Wien / Austria
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|